Project Details
Description
This project designed based on optimal sizing and cost analysis of diesel- solar Microgrids with battery storage for three aboriginal communities in WA. The feasibility cost studies along with the design of a hybrid solar, diesel and battery system have been performed to identify the best reliable and suitable model. The outcome demonstrated increasing in renewable fraction while reducing the levelised cost of energy and initial investment.
Status | Finished |
---|---|
Effective start/end date | 4/01/16 → 4/01/17 |