Abstract
A planning and scheduling model is developed for the onsertion-phase in printed circuit board (PCB) assembly. PCBs are manufactured by machines that mount components, such as chips, on a PCB. On an onsertor machine, a certain number of component types can be stored. These components are subsequently used for the production of a certain PCB batch type. This research develops a production planning and scheduling formulation to determine the component–machine allocations, as well as a PCB sequence. Two strategies are proposed; one focusing on minimal number of changeovers (C-strategy), and the other on minimal process time (P-strategy). Both strategies were validated in a pilot study with real company data, with encouraging results for potential implementation.
Original language | English |
---|---|
Pages (from-to) | 909-925 |
Number of pages | 17 |
Journal | European Journal of Operational Research |
Volume | 183 |
Issue number | 2 |
DOIs | |
Publication status | Published - 2007 |
Externally published | Yes |
Keywords
- Production
- Scheduling
- Sequencing
- Printed circuit boards