Abstract
The present study analyzed the potential of eight operational mining sites in Uzbekistan for the installation of photovoltaic (PV) systems: Sarmich, Ingichka, Kuytosh, Yakhton, Chauli, Sherobod, Chorkesar, and Tebinbuloq. A PV system with 1 MW capacity, which required a total of 4926 m2 of project land, was considered. The renewable energy analysis software RETScreen, developed by Natural Resources Canada (NRC), was used to calculate energy production, greenhouse gas reduction, and financial factors of the PV systems in the selected study areas. The iron mine Tebinbuloq in Karakalpak showed the highest potential, with annual electricity production of approximately 1685 MWh, equating to a potential reduction of approximately 930 tons of greenhouse gases. The economic benefit of the PV system in this mine was $2.217 million USD net present value with a project payback period of approximately 13 years. The results of precision checks of satelliteand ground-based solar measurements showed high correlations; hence, satellite-based data can be applied for solar project assessments where solar monitoring meteorological stations are not available.
Original language | English |
---|---|
Article number | 2988 |
Pages (from-to) | 1-13 |
Number of pages | 13 |
Journal | Sustainability |
Volume | 11 |
Issue number | 10 |
DOIs | |
Publication status | Published - 2 May 2019 |
Externally published | Yes |
Bibliographical note
Copyright the Author(s) 2019. Version archived for private and non-commercial use with the permission of the author/s and according to publisher conditions. For further rights please contact the publisher.Keywords
- photovoltaic system
- solar energy
- mining industry
- renewable energy