Research on IGCC EPC estimation model of China

He Huang*, Fen He, Zheng Li, Wei Dou Ni, Jian Kun He, Xi Liang Zhang, Lin Wei Ma

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

5 Citations (Scopus)

Abstract

In economic assessment of Integrated Gasification Combined Cycle (IGCC), estimation of EPC (Engineering, Procurement, Construction) cost directly affects the reliability of results. Relevant Foreign EPC models are not suitable for China's situation. Reasonable modifications on these models were provided to take into account different localization levels of key equipments, based on equipment quotations and the actual project cost in domestic market. The main contribution is to add or modify regional factor, scaling factor and time factor to original models, finally obtaining the IGCC EPC model based on China's actual situation.

Original languageEnglish
Pages (from-to)475-479
Number of pages5
JournalDongli Gongcheng/Power Engineering
Volume28
Issue number3
Publication statusPublished - Jun 2008
Externally publishedYes

Keywords

  • Cost
  • Economics
  • Energy and power engineering
  • EPC
  • Estimation model
  • IGCC

Fingerprint

Dive into the research topics of 'Research on IGCC EPC estimation model of China'. Together they form a unique fingerprint.

Cite this