“The times they are a-changin’”: a longitudinal, mixed methods case study of a hospital transformation

Research output: Contribution to journalArticlepeer-review

2 Citations (Scopus)
52 Downloads (Pure)

Abstract

Background
Changes to hospital infrastructure are inevitable in ever-evolving healthcare systems. The redevelopment of hospitals and opening of new buildings can be a complex and challenging time for staff as they must find ways to deliver safe and high-quality care while navigating the complexities and uncertainties of change. This study explores the perspectives and experiences of staff and patients before and after the opening of a new hospital building as part of a large public hospital redevelopment in Sydney, Australia.

Methods
The study comprised a longitudinal mixed methods case study design. Methods included two rounds of staff surveys (n = 292 participants), two rounds of staff interviews (n = 66), six rounds of patient surveys (n = 255), and analysis of hospital data at tri-monthly intervals over two years. Data were compared before (2019) and after (2020) a new hospital building opened at a publicly funded hospital in Sydney, Australia.

Results
Four key themes and perspectives emerged from the interviews including change uncertainty, communication effectiveness, staffing adequacy and staff resilience. Significant differences in staff perceptions of change readiness over time was identified. Specifically, perceptions that the organisational change was appropriate significantly decreased (2019: 15.93 ± 3.86; 2020: 14.13 ± 3.62; p < .001) and perceptions that staff could deal with the change significantly increased (2019: 17.30 ± 4.77; 2020: 19.16 ± 4.36; p = .001) after the building opened compared to before. Global satisfaction scores from patient survey data showed that patient experience significantly declined after the building opened compared to before (2020: 81.70 ± 21.52; 2019: 84.43 ± 18.46)), t(254) = -64.55, p < 0.05, and improved a few months after opening of the new facilities. This coincided with the improvement in staff perceptions in dealing with the change.

Conclusions
Moving into a new hospital building can be a challenging time for staff and patients. Staff experienced uncertainty and stress, and displayed practices of resilience to deliver patient care during a difficult period of change. Policy makers, hospital managers, staff and patients must work together to minimise disruption to patient care and experience. Key recommendations for future hospital redevelopment projects outline the importance of supporting and informing staff and patients during the opening of a new hospital building.
Original languageEnglish
Article numbere0272251
Pages (from-to)1-16
Number of pages16
JournalPLoS ONE
Volume17
Issue number10
DOIs
Publication statusPublished - 25 Oct 2022

Bibliographical note

Copyright the Author(s) 2022. Version archived for private and non-commercial use with the permission of the author/s and according to publisher conditions. For further rights please contact the publisher.

Fingerprint

Dive into the research topics of '“The times they are a-changin’”: a longitudinal, mixed methods case study of a hospital transformation'. Together they form a unique fingerprint.

Cite this